Where does the landlord's work end and the tenant's begin?
Wherever the lease says. Most leases attach a schedule of landlord work, often called the base building or a vanilla box: demising walls, a base level of services and a washroom. Everything else is tenant work. Read that schedule against the real unit before pricing; a service shown on a leasing plan is not always where the plan puts it. Bringing a vacant unit to that condition is a unit turnover.
Does a tenant fit-out need a building permit?
Usually. Interior alterations to a commercial unit generally need one. Hamilton publishes building permit guidance for small businesses, and Toronto has its own non-residential interior alterations guide. A new kind of business in the unit can also need zoning sign-off: Oakville and Mississauga both issue a Zoning Certificate of Occupancy for a change of use.
What is in a landlord's tenant criteria package?
The rules for building in that property: approved materials and storefront details, working hours, delivery routes, the base-building engineer who reviews mechanical and electrical changes, the insurance and documents contractors must file, and who signs off. In a managed centre these rules can move the schedule more than the drawings do, so they belong in the bid package.
Who pays for a tenant improvement?
The lease decides that too. Some leases give the tenant an allowance toward the work; others leave every dollar past the base building to the tenant. Either way, the contract for the work is between the tenant and the contractor, and the Ontario rules on payment and holdback apply. Prompt payment explains the timing.
What should a tenant send to get the work priced?
The lease's landlord-work schedule, the tenant criteria package, the drawing set, the equipment list and the possession and opening dates. Retail, clinic, lab, spa, golf studio and office fit-outs each add their own requirements on top.
| Part of the unit | Usually landlord work | Usually tenant work |
|---|---|---|
| Walls | Demising walls between units. | Interior partitions, finishes and storefront details. |
| Services | A base supply of power, water and HVAC to the unit. | Distribution inside the unit, fixtures and equipment hook-ups. |
| Approvals | The base building's own permits. | The building permit for the fit-out and any change-of-use approval. |
| Rules | Sets the tenant criteria and reviews drawings. | Builds to the criteria and files the contractor documents. |