What should a kitchen renovation solve?
The way you use the room. A crowded preparation area, an awkward appliance position or too little storage calls for a different answer from worn cabinet doors. Write down the daily problems before choosing finishes. A new island only works if doors, seating and the route between sink, stove and fridge still have room.
When does a kitchen renovation need a permit?
When it changes structure, plumbing or other building systems. Hamilton's building permit page sets out which work needs one, and Toronto's permit requirements page gives the same answer for that city. Replacing cabinets in place is usually finish work; removing a wall between the kitchen and dining room is construction. See the renovation permit guide.
Who does the electrical work in a kitchen?
An electrical contractor. The Electrical Safety Authority tells homeowners that anyone hired for electrical work must be an electrical contractor holding an ESA licence, and that the work needs a notification. New circuits for appliances, under-cabinet lighting and moved outlets all count.
What needs to be decided before cabinets are ordered?
The appliance models, cabinet dimensions, sink position and countertop material, together. A late change to one moves the others. Design and selections covers those decisions; whole-home renovation planning matters when the kitchen opens into other rooms, and framing and drywall when a wall moves.
What helps Cruzz price the kitchen?
Room photos, rough dimensions, the appliance list and your cabinet and counter preferences. Say whether the floor stays and whether you will live in the home during the work. Name any products you are buying yourself so the quote separates supply from installation. Send the details.
| Scope | What changes | What it usually involves |
|---|---|---|
| Same layout | Cabinets, counters, backsplash, fixtures. | Finish work; no structural change. |
| Moved services | Sink, appliances or lighting in new places. | Plumbing and electrical work, with the ESA notification. |
| Opened room | A wall removed or a new opening made. | Structural review and a building permit before demolition. |
